Two-Tier Mezzanine, 7.6Kn/2 loading project for Europa International Ltd

We have recently completed a Two-Tier Mezzanine, 7.6Kn/2 loading project for Europa International Ltd, with a multi-level conveyor system.

The Criteria

Europa International Ltd required a mezzanine floor within their distribution centre for one of their clients.

The final requirements of the project were detailed as follows:

  • Mezzanine Floor – 48m x 18m two-tier system a total of 825m2
  • Featuring Part M and Part K staircases
  • Handrail painted to the client’s specification
  • Two no up and over safety gates for loading

The Solution & Result

Despite delivery and installation being on a tight timescale, the build program was completed over a period of 20 days, finishing in March 2018.