Two-Tier Mezzanine, 7.6Kn/2 loading project for Europa International Ltd
We have recently completed a Two-Tier Mezzanine, 7.6Kn/2 loading project for Europa International Ltd, with a multi-level conveyor system.
The Criteria
Europa International Ltd required a mezzanine floor within their distribution centre for one of their clients.
The final requirements of the project were detailed as follows:
- Mezzanine Floor – 48m x 18m two-tier system a total of 825m2
- Featuring Part M and Part K staircases
- Handrail painted to the client’s specification
- Two no up and over safety gates for loading
The Solution & Result
Despite delivery and installation being on a tight timescale, the build program was completed over a period of 20 days, finishing in March 2018.